Written by: Diksha Kalra
Published: Sep 16, 2026
Updated: Sep 16, 2026
1 min read
Before opening to the public, a portion of the approach road of the recently completed flyover which passes through the Medical College campus caved in following heavy rain last week. The flyover which was constructed at a cost of Rs 18.06 crore was to be inaugurated in May second week. Sources said the soil under the approach road was swept away in the rain which resulted in the road caving in. However, the contractor, Infrastructure Kerala (Inkel) Ltd, has started work to rectify it by re-tarring the portion after strengthening the foundation.
Stay Connected, Stay Informed –
Don’t miss out on exclusive updates, market trends, and real-time investment opportunities. Be the first to know about the latest unlisted stocks, IPO announcements, and curated Fact Sheets, delivered straight to your WhatsApp.
Mutual Fund License No.:
ARN-164419
IRDA Code (1):
ABLIC1003123454
IRDA Code (2):
ABLIC1003131639
Startup India Certificate No.:
DIPP93786
Other Websites
ⓒ 2016-2026 Planify. All rights reserved, Built with
in India